Deck Concrete Pouring Quotes

Get Professional Services

Cost of Deck Concrete Pouring in Rockville

Pouring concrete for a deck in Rockville, MD, involves various considerations that can impact the overall cost. From material prices to labor charges, understanding these factors can help homeowners budget effectively for their decking projects.

Factors Affecting Cost

  • Size of the Deck: Larger decks require more materials and labor, increasing the overall cost.
  • Type of Concrete: Different types of concrete, such as standard or high-strength, vary in price.
  • Site Preparation: Costs for clearing the area, leveling the ground, and building forms.
  • Labor Costs: Varies based on the complexity of the project and local labor rates.
  • Permits and Inspections: Fees for necessary permits and any required inspections.
  • Weather Conditions: Adverse weather can delay the project and increase costs.
  • Accessibility of the Site: Difficult-to-access sites may require additional equipment or labor.
  • Reinforcement Materials: Use of rebar or mesh to strengthen the concrete can add to the cost.

Average Costs for Common Tasks

Task Average Cost (Rockville, MD)
Site Preparation $500 - $1,200
Concrete (per cubic yard) $125 - $150
Labor (per hour) $50 - $75
Reinforcement Materials $0.10 - $0.20 per sq. ft.
Permits and Inspections $200 - $500
Concrete Pumping $500 - $1,000
Finishing and Sealing $2 - $4 per sq. ft.
Cleanup and Disposal $200 - $600

Deck Concrete Pouring